Salesforce Transit Center Crack Due To 2017 Cost Reduction Change Order?

salesforce-transit-center-crack
(Last Updated On: December 29, 2018)

Oakland News Now – Salesforce Transit Center Crack Due To 2017 Cost Reduction Change Order?

Oakland Now reports that a cost committee created by the Transbay Joint Powers Authority under executive director Mark Zabadeh may have ordered a change order that called for exposed steel to replace a planned concrete support system above the bus ramp.

This is the second example of how cost cutting done in the wake of the termination of Salesforce Transit Center Developer Maria Ayerdi Kaplan has apparently hampered the operation of the Transit Center.

Read more here at Oakland Now: https://oaklandnewsnow.com/index.php/2018/09/26/salesforce-transit-center-closed-due-to-cracked-steel-beam-under-roof-top-park-were-cost-cutting-efforts-to-blame/

Stay tuned.

Oakland Now Note: this post demonstrates the full and live operation of the latest version of an experimental mobile media video-ging system network that’s part of a new approach to the production of media. The uploaded video is from a ger with the Zennie62 onYouTube Partner Channel, then uploaded to and formatted automatically at the Oakland Now site and social media pages. The objective is real-time on the scene reporting of , interviews, observations, and happenings anywhere in the World and within seconds and not hours. We are constantly working to improve the system network coding and also seek interested content and media technology partners.

News
https://youtu.be/HO-tEOHNwRA

Avatar

By Zennie Abraham

Zennie62Media, Inc. CEO Zenophon Abraham AKA Zennie62 YouTube Zennie62.com Oakland News Now, OaklandNewsNow.com Zennie62 YouTube Partner, Oakland California blogger / vlogger hire @Zennie62Media, Inc to tell your story.

;

Oakland News Now Recent Blog Posts

Do NOT follow this link or you will be banned from the site!